ANALISIS PELAKSANAAN TATA LETAK (LAY OUT) PERALATAN PABRIK UNTUK MENINGKATKAN EFISIENSI KERJA

Puspita Sari, Santy and Syamsul, Bachri (2012) ANALISIS PELAKSANAAN TATA LETAK (LAY OUT) PERALATAN PABRIK UNTUK MENINGKATKAN EFISIENSI KERJA. Undergraduated thesis, Fakultas Ekonomi UNIB.

[img] Text
Skripsi Santy Puspita Sari-0.pdf - Bibliography
Restricted to Registered users only
Available under License Creative Commons GNU GPL (Software).

Download (4MB)

Abstract

The aims of this research is to know compilation alternative arrange the situation equipments of factory (out lay) at PT. Technological Bio Nusantara more than efficient Bengkulu. this Research type is descriptive research, that is research with aim to explain and depict a phenomenon that happened in field through direct observation in field. Data type was used data namely obtained data of field observation and interview with side which competency, in this case superintendent of managing director and production of PT. Bio Nusantara Teknlogi Bengkulu. Method intake of data conducted with direct observation namely by direct perception in field to production process of TBS (fresh fruit) coconut of sawit become CPO (crude palmoil). Besides used stop watch and gauge to count travelled distance and production process time efficiency of TBS (fresh fruit) coconut of sawit become CPO (crude palmoil). Method analyse data used quantitative descriptive analysis by conducting comparison of time and distance between] out lay in this time with device of new lay out. Pursuant to research of field, obtained result that : (1) Compilation arrange situation equipments of factory (layout) Technological PT Bio Nusantara Teknologi Bengkulu not yet earned is optimal of capacities produce processing of palm oil; (2) Compilation arrange situation equipments of factory (layout) PT Bio Nusantara Teknologi Bengkulu not yet earned to improve work efficiency, either from time side, amount of, and also expense of; and (3) Device of re-lay out to travelled distance equal to 411meters and go through raw material go to factory facilitys more than efficient equal to 31,01 minutes.

Item Type: Thesis (Undergraduated)
Subjects: H Social Sciences > H Social Sciences (General)
Divisions: Faculty of Economy > Department of Management
Depositing User: 014 Abd. Rachman Rangkuti
Date Deposited: 22 Dec 2013 19:25
Last Modified: 22 Dec 2013 19:25
URI: http://repository.unib.ac.id/id/eprint/5337

Actions (login required)

View Item View Item