Items where Author is "Septian, Pratama"

Up a level
Export as [feed] Atom [feed] EPP RSS 2.0 [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Book Section
Number of items: 1.

Book Section

Septian, Pratama and Muhammad, Fauzi and Samsul, Bahri OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHANTENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF. In: PROSIDING CIVIL ENGINEERING AND BUILT ENVIRONMENT CONFERENCE (CEBEC) 2019. UNIB Press, Bengkulu, pp. 278-288. ISBN 978-602-5830-08-2

This list was generated on Sat Jan 7 02:19:03 2023 WIB.