Mayfi, AM Saifutaqi Fatwa and Nurul, Iman Supardi and Angky, Puspawan (2022) MAINTENANCE DAN INSPECTION PADA RUNNER TURBIN. Rekayasa Mekanik, 6 (2). pp. 77-82. ISSN 2597-4254
Artikel Maintenance dan Inspection pada Runner Turbin_Jurnal Rekayasa Mekanika_Mechanical Engineering Scientific Journal, Pure and Inter Disciplinary_Vol.6 No.2_4 Oktober 2022_Angky Puspawan..pdf - Published Version
Available under License Creative Commons GNU GPL (Software).
Download (712kB) | Preview
Abstract
The PLTA TES is a generator that relies on water as the driving force for a turbine unit system. There are 7 PLTA
Tes turbine units that are still operating with alternating working hours. In keeping a turbine unit operating
properly, one way is to do maintenance and general inspection (GI). Maintenance is one way to keep a tool or
object from being damaged. Then General Inspection (GI) is a process of activities in the PLTA Test company in
checking, measuring, adjusting, repairing and testing one turbine unit in operating for 20,000 hours on a regular
basis so that the unit can operate better than before, maintenance is carried out. One of the turbine components
that is the object of maintenance is the runner. The runner is the heart of a turbine so that it can operate by
relying on flowing water so that the runner can rotate. Runners are given a spot check to see if there is a crack in
the runner's condition and measure the runner's clearance so that there is no excessive friction when the runner is
operating and the runner is not thirsty
Item Type: | Article |
---|---|
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Faculty of Engineering > Journal |
Depositing User: | UPT Perpustakaan Universitas Bengkulu |
Date Deposited: | 06 Apr 2023 03:45 |
Last Modified: | 06 Apr 2023 03:45 |
URI: | https://repository.unib.ac.id/id/eprint/11782 |