PENETAPAN STANDAR WAKTU PROSES PRODUKSI PAKAIAN SERAGAM SEKOLAH MENEGAH ATAS(STUDI KASUS ADIGUNA TAILOR DAN ELWIS TAILOR SEBAGAI OBJEK PEMBANDING)

Saputra, Deby Purnandes and Warsono, Sri (2014) PENETAPAN STANDAR WAKTU PROSES PRODUKSI PAKAIAN SERAGAM SEKOLAH MENEGAH ATAS(STUDI KASUS ADIGUNA TAILOR DAN ELWIS TAILOR SEBAGAI OBJEK PEMBANDING). Undergraduated thesis, Universitas Bengkulu.

[img]
Preview
Archive (Thesis)
I,II,III,I-14-deb-FE.pdf - Bibliography
Available under License Creative Commons GNU GPL (Software).

Download (4MB) | Preview
[img]
Preview
Archive (Thesis)
IV,V,LAMP,I-14-deb-FE.pdf - Bibliography
Available under License Creative Commons GNU GPL (Software).

Download (4MB) | Preview

Abstract

This research had purposed to know standard timing process to producing high school unifrom such as size M for white unifrom and size 78 for grey long pants.The working time doing with study of times to searcing average of time, normal of time and stock of time then getting standard timing process.Standard timing process was founded of Adiguna taylor and Elwis taylor can be minimize the unproductive time percentage by improve repairing labour management company.Standart timing process was founded of Adiguna taylor were chlothes 40.596 minutes, pantes 32,235 minutes. Mean while in Elwis taylor was founded that 47,69 minutes,pants 42,89 minutes.

Item Type: Thesis (Undergraduated)
Subjects: H Social Sciences > H Social Sciences (General)
Divisions: Faculty of Economy > Department of Management
Depositing User: 023 Dody Sahdani
Date Deposited: 03 Sep 2014 15:47
Last Modified: 03 Sep 2014 15:47
URI: http://repository.unib.ac.id/id/eprint/8250

Actions (login required)

View Item View Item